Operational performance report
Level crossing report
Level crossing findings
Boom down to train detection
Lead time is measured from boom down to train detection. Statistics cover the findings shown below.
Average lead time
—
Short lead-time events
—
Minimum
—
Maximum
—
Movements
Recorded timings
| Sr. No. | Date | Boom Down | Lever Lock | Train Arrival | Time Difference (min / sec) |
Classification |
|---|
No anomalies to display for the selected date range.
Event graphs
Highlighted interval: boom down to train detection. Times shown in IST.